Permit Fee Schedule
New construction and additions:
Use Groups: B, E, H, I-1, I-2, I-3, M, R-1, R-2, R-3, R-4, R-5 and U
.038 per cubic foot
Use Groups: A-1, A-2, A-3, A-4, A-5, F-1 and S-2
.021 per cubic foot
Commercial farm buildings
.012 per cubic foot
Minimum fee: $200.00
Renovations, alterations and repair:
$30.00 per one thousand dollars of estimated cost of work (including labor)
Minimum fee shall be $65.00
Roofing and siding:
$30.00 per one thousand dollars of estimated cost of work (including labor)
Minimum fee shall be $65.00 -
Commercial only
Residential $75.00 flat fee plus state fees
Signs:
$5.00 per square foot of surface area of the sign.
Minimum fee shall be $65.00
Sheds:
100 square foot to 200 square foot $65.00
201 square foot and over $100.00
Open Decks:
Under 100 square foot, minimum fee $65.00
100 square foot to 200 square foot $100.00
201 square foot to 400 square foot $150.00
401 square foot and over $200.00
Building Residential Solar Photovoltaic:
Flat fee of $200.00
Plumbing:
$15.00 per plumbing fixture
Special devices: $91.00
Water and sewer connections: $65.00 each
Gas piping: $65.00 per tank
Baseboard radiation and radon piping: $65.00
Minimum fee shall be $65.00
Pools:
Same as alteration fees plus electric
Maximum above-ground fee $150.00
Maximum in-ground fee $340.00
Demolition:
$150.00 for commercial, $82.00 for residential
$65.00 for removal of underground storage tanks
Fire protection and other hazardous equipment:
Fuel oil: $58.00 for residential, $65.00 for commercial,
gasoline & propane tanks are $65.00 each
Detectors:
1 to 12 $45.00
each additional 25 detectors will be $15.00
Sprinklers:
1 to 20 $82.00
21 to 100 $250.00
101 to 200 $400.00
201 to 400 $748.00
401 to 1000 $1036.00
over 1000 $2200.00
Special suppression and hood exhaust systems: $120.00 each
Standpipes: $289.00 per riser
Heating systems: $58.00 per appliance for residential and $65.00 per appliance for commercial
Minimum fee: $65.00
Fireplaces and wood stoves: $65.00 each
Electric:
Fixtures: all switches, lighting and receptacles
1 to 5
$ 50.00
$10.00 each additional 25 or fraction thereof:
Light standards:
1 to 5
$ 65.00
$10.00 each additional
Service meter equipment and feeders:
up to 200 amps
|
$ 65.00
|
20l to 1000 amps
|
$130.00
|
over 1000 amps
|
$640.00
|
Heating, cooling, cooking equipment and similar appliances:
Single outlet of 20 k.w. or less: $40.00
Motors:
1 h.p. to 10 h.p. $40.00
11 h.p. to 50 h.p. $65.00
51 h.p. to 100 h.p. $130.00
Over 100 h.p. $640.00
Swimming pools:
New installation, bonding and wiring (in ground): $100.00
Above ground: $70.00
Generators, transformers, (vaults, enclosures, sub-stations)
1 to 10 K.V.A. $40.00
11 to 50 K.V.A. $65.00
51 to 100 K.V.A. $130.00
Over 100 K.V.A. $640.00
Electric Residential Solar Photovoltaic:
Flat fee of $200.00
Electric sign:
1 to 5 $ 50.00
Each additional sign $10.00
Reintroduction of service: $60.00
Misc. or special equipment, special service and/or conditions not provided for in this schedule apply for fee.
Minimum fee: $65.00
Certificates:
10% of the total permit fee, minimum of $50.00
Multiple certificates: $50.00 per unit
Temporary certificate of occupancy: Additional fee of $50.00
|