Pool Permit Procedure

The complete construction permit application consists of:

*Construction Permit Application (completed) which includes:

*Building Subcode Technical Section

*Electrical Subcode Technical Section

  Homeowner may do the electrical work, if he/she is the primary resident.
  If an electrical contractor is doing the work, they must sign and seal the permit 
  application.

* Zoning Approval (Please allow 5-10 working days for zoning approval.)

Plans Required:

Above Ground Pool Plans consists of Pool Brochure and Filter Brochure

In-ground Pool Plans consists of 2 sets of Architecturally or Engineered Sealed 
Plans and Filter Brochure

Once completed applications and plans are submitted, please allow 10-14 working days for the permit to be issued!

Inspections & Information

Above/Inground Pool Handout
Soft-Sided/Inflatable Pool Handout

If you have any questions, or would like to schedule inspections, you may call:
(856) 845-5300

A 24-hour notice is needed WHEN scheduling inspections. Call the preceding day for the requested inspection.

Note: You must schedule and pass ALL Final Inspections prior to pool usage!